Re: Eastwood Park Leisure Centre 4 years, 3 months ago #301

  • RM64
  • OFFLINE
  • Platinum Boarder
  • Posts: 3164
  • Karma: 19
Eastwood Park Masterplan

There are 3 further annexes

- High Level Economic Assessment,
- Traffic Modelling Technical Note,
- Land Use Model Technical Note.

You can read them here -

www.eastrenfrewshire.gov.uk/CHttpHandler.ashx?id=25642&p=0

Re: Eastwood Park Leisure Centre 4 years, 3 months ago #302

  • RM64
  • OFFLINE
  • Platinum Boarder
  • Posts: 3164
  • Karma: 19
Has the case been made for a 6 lane 50m Swimming Pool ?

Is the cost justified?

Why will a 6 lane 25m Swimming Pool not be adequate?

Re: Eastwood Park Leisure Centre 3 years, 8 months ago #303

  • RM64
  • OFFLINE
  • Platinum Boarder
  • Posts: 3164
  • Karma: 19
The Eastwood Park Masterplan cross party member and officer working group met on 12 March 2020.

No other information is available.


Mahon, Gerry
freedom of information review request
17:55
FW: Eastwood Leisure Centre and Eastwood Park Master Plan: Member/Officer Working Group 12th March 2020.eml

FW: Eastwood Leisure Centre and Eastwood Park Master Plan: Member/Officer Working Group 12th March 2020

Cahill, Andrew < This e-mail address is being protected from spambots. You need JavaScript enabled to view it >
01/07/2020 16:21
11
24.1 KB
181219_Eastwood Leisure Centre and Eastwood Park Masterplan.docx

From: Fry, Lesley < This e-mail address is being protected from spambots. You need JavaScript enabled to view it >
Sent: 24 June 2020 12:08
To: Cahill, Andrew < This e-mail address is being protected from spambots. You need JavaScript enabled to view it >
Subject: FW: Eastwood Leisure Centre and Eastwood Park Master Plan: Member/Officer Working Group 12th March 2020

From: Fry, Lesley On Behalf Of Cahill, Andrew
Sent: 11 March 2020 15:31
To: Buchanan, Tony (Cllr); Cahill, Andrew; Daws, Phil; Fletcher, J (Provost); Grant, B (Cllr); Ian Harper; McReavy, Anthony; Merrick, C (Cllr); O'Kane, Paul (Cllr); Shaw, Mhairi; Smith, Graeme5; Wallace, Gordon (Cllr)
Cc: Bruce, Christina
Subject: Eastwood Leisure Centre and Eastwood Park Master Plan: Member/Officer Working Group 12th March 2020

Colleagues

Eastwood Leisure Centre and Eastwood Park Master Plan: Member/Officer Working Group

Please find attached a copy of the covering report which contains a link to the consultant’s Vision and Master plan report considered by the Council on 18 December 2019 for discussion at the 1st meeting of the Member/Officer to be held tomorrow at 11am in the Committee Room at Eastwood HQ. Some printed copies will be available at the meeting.

At the meeting I intend to take the group through the background, the findings, the potential vision and the options at a fairly high level.

Stallan Brand consultants will be in attendance to assist and answer any queries.

Regards
Andy

Lesley Fry
Secretary to Director of Environment
Environment Department


Mahon, Gerry
freedom of information review request
17:55
FW: Eastwood Leisure Centre and Eastwood Park Masterplan Working Group.eml

FW: Eastwood Leisure Centre and Eastwood Park Masterplan Working Group

Fry, Lesley < This e-mail address is being protected from spambots. You need JavaScript enabled to view it >
01/07/2020 16:20
11
2.8 KB
Eastwood Leisure Centre and Eastwood Park Master.ics
FW: Eastwood Leisure Centre and Eastwood Park Masterplan Working Group
Date 12/03/2020
Time 11:00 -> 13:00 Time zone [GMT +00:00] Europe/London
Repeats Never
Participants Mahon, Gerry
Description

-----Original Appointment-----
From: Fry, Lesley < This e-mail address is being protected from spambots. You need JavaScript enabled to view it >
Sent: 26 February 2020 16:35
To: Fry, Lesley; Cahill, Andrew; Buchanan, Tony (Cllr); Daws, Phil; Fletcher, J (Provost); Grant, B (Cllr); Ian Harper; McReavy, Anthony; Merrick, C (Cllr); O'Kane, Paul (Cllr); Shaw, Mhairi; Wallace, Gordon (Cllr)
Subject: FW: Eastwood Leisure Centre and Eastwood Park Masterplan Working Group
When: 12 March 2020 11:00-13:00 (UTC+00:00) Dublin, Edinburgh, Lisbon, London.
Where: Committee Room, HQ

-----Original Appointment-----
From: Fry, Lesley
Sent: 26 February 2020 16:35
To: Buchanan, Tony (Cllr); Cahill, Andrew; Daws, Phil; Fletcher, J (Provost); Grant, B (Cllr); Ian Harper; McReavy, Anthony; Merrick, C (Cllr); O'Kane, Paul (Cllr); Shaw, Mhairi; Wallace, Gordon (Cllr)
Subject: Eastwood Leisure Centre and Eastwood Park Masterplan Working Group
When: 12 March 2020 11:00-13:00 (UTC+00:00) Dublin, Edinburgh, Lisbon, London.
Where: Committee Room, HQ


Good afternoon

You are invited to the inaugural meeting of the Eastwood Leisure Centre and Eastwood Park Masterplan Working Group.

A light lunch will be provided.

Regards
Lesley

Location Committee Room, HQ
Going? YesMaybeNo

Re: Eastwood Park Leisure Centre 3 years, 6 months ago #304

  • RM64
  • OFFLINE
  • Platinum Boarder
  • Posts: 3164
  • Karma: 19
Do the Trust have 'inside knowledge' of the Masterplan and that the Theatre has a future in its current state/location?

Published Newton Mearns, Clarkston & Busby Community Magazine -

September 2020

EASTWOOD PARK THEATRE REVAMP

The curtains may be closed on stage at Eastwood Park Theatre for the moment but work has been progressing behind the scenes to give the space a revamp.

The theatre has been painted, while carpets and chair coverings have also been upgraded...................

????

Re: Eastwood Park Leisure Centre 3 years, 6 months ago #305

  • RM64
  • OFFLINE
  • Platinum Boarder
  • Posts: 3164
  • Karma: 19
Just for interest - This was found on line -

Craig Paton Illustrations

East Renfrewshire Culture & Leisure

The East Renfrewshire Council is a council authority just outside of Glasgow, it includes the areas Barrhead, Clarkston and Newton-Mearns.

I was commissioned by them in early 2017, to create illustrations depicting proposed community building projects and renovations.

This would include illustrations of the buildings exterior presentation and interior plans.

Two of the buildings do not yet exist and had to be drawn from imagination (The Dunterlie Community Hub and The Eastwood Leisure Centre).

The remaining two were buildings already exist but would undergo significant renovation (The Eastwood Park Theatre and The Fairweather Community Hub).

Rather than drawing in a formal architectural style, I created these illustrations with a loose, sketchy style. After a few thumbnail sketches and mock-ups to iron out the designs, I drew and coloured the final artwork in Adobe Photoshop.

I’ve yet to receive work as to whether these illustrations will actually be made into the buildings they depict.

Early 2017
Client: East Renfrewshire Council, Eastwood Park Theatre


You can find the Website and drawings here -

www.craigpaton.com/portfolio/east-renfrewshire-culture-leisure/

Re: Eastwood Park Leisure Centre 3 years, 6 months ago #306

  • RM64
  • OFFLINE
  • Platinum Boarder
  • Posts: 3164
  • Karma: 19
This is a text transcript of the document.

Unfortunately a technical glitch means I cannot post the full document with pictures/diagrams on the site.

Hopefully the text will give an idea of what the working group are proposing?

200813 RIBA Stage 1 Summary Presentation-1


Stallan-Brand
Date: 13/08/2020
1076.00 Eastwood Leisure Centre and Theatre
Working Group Summary Update

Summary

Key Points from Initial Working Group Meeting in March

• Benefits of location of Leisure Centre and Theatre agreed.

• Progress proposal for the Leisure Centre and Theatre with Leisure Trust as initial priority.

• Closer relationship between Leisure Centre and Theatre and Eastwood House.

• Physical link with St Ninians not desirable.

• Parking noted as point for further consideration, particularly in relation to St Ninians.

RIBA Stage 1 Briefing and Feasibility Developed
• Fortnightly workshops from early April to end June with Leisure Trust.

• Draft document issued for comment.

• Animations prepared to give a sense of the vision.

Key Developments
• Initial aspirations of the brief and vision developed.

• Concept design strategy developed which establishes excellent facilities can be accommodated which are sensitive to and benefit from the site.

• Building remains in similar position but pulled away slightly from St Ninians to allow existing parking to be maintained during construction and beyond if preferred.

• Revised building position avoids a key sewer which has been identified.

• Diagrammatic building plan developed which tests spatial requirements with clear legible architectural approach whilst considering engineering and environmental design at same time as offering flexibility.

• Clear strategy for delivering best value and quality considering existing infrastucture, opportunities, constraints and attractive site characteristics

• Tandem build allowing existing buildings and parking to remain operational during construction.

Additionality Considered
• Broader potential of Eastwood Park and each of the facilities within it.

• Potential incorporation of library in the theatre and leisure centre.

• Orangerie proposal for Eastwood House.

Programme
• Outline Programme prepared to consider overall timescales and priorities.